If your jaw crusher machine needs to be put on hold for a long time, then you need to pay attention to the maintenance of the machine parts:

Jaw crusher

1.Jaw crusherin the arrangement and layout of the airport, should ensure that any one of the mechanical access is not affected by other machinery.

2.The jaw crusher should be stored in a dry room, and if you have to stop outside, you should choose a flat floor and lay a plank on it. Cover with a cloth after parking.

3.The jaw crusher shall place the fuel control lever of the machine in the idle position, and each lever is placed in an air position. The impact crusher is the same.

4.Before the jaw crusher is stored for a long time, it is necessary to maintain the machine, repair the damaged parts, and clean it thoroughly to keep the technology in good condition.

Jaw crusher workshop

5.Battery: Should remove the battery, put the battery in dry and antifreeze place. To keep its surface clean and dry, it is prohibited to place conductive objects on the battery. When the battery is removed, first the negative line is cut off, then the positive line is cut off, and the positive line is connected to the negative line before being installed. Because the electrical system of construction machinery are all negative iron, this is to prevent the disassembly of batteries caused by short circuit. Lead-acid batteries should be recharged once a month.

6.Engine: release cooling water from the engine. Replace engine oil. The new oil is usually neutral and does not corrode the engine's metal parts. The fuel tank is filled with diesel fuel to prevent the fuel tank from rusting. Preservatives should be added if conditions permit. During the downtime, the engine should be started once a month, so that the machinery can run for a short distance, so that the lubricating parts of the new oil film to prevent rust. It should be noted that the cooling water should be filled up before starting, and the cooling water should be exhausted at the end.

Crushing site of jaw crusher

7.Anti-rust problem: Before storage, jaw crusher should be treated as the size of the outer surface paint Peel area to determine whether the method is used to repair paint or to use the whole machine to repaint. The working equipment of the construction machinery, such as the ironing plate of paver, the bucket of loader, the scraper of grader, and so on, the rust-proof method of the bare place of the metal is daub butter.

When the long-used machine is used again, it needs to carefully check the condition of all parts and components. If there is any rust or damaged part, please deal with it immediately so as to avoid causing hidden trouble to the machine. If you don't know, you can consult online for more details.